Hartford Pavilion

Funded on Spacehive 8 March 2022

Impact data and claims within this report are provided by the project creator and have not been independently verified by Spacehive.

Hartford Pavilion

HARTFORD PARISH COUNCIL By HARTFORD PARISH COUNCIL

The project will renovate an old football pavilion bringing it into the 21 century and able to be used as a fully accessible community workshop space for local groups.

Hartford Delivery stage

41
backers
£73,190
raised
funded icon
This project was funded on 08 Mar 2022!

The existing building is a single breeze block, which was originally built to provide changing facilities for Hartford Junior Football Club. It is divided into 3 spaces (Home, Away and Referee changing rooms) with toilets and showers. The building hasn't been in use since 2017 and has fallen into disrepair. This project will remodel the building into 3 workshop spaces with communal utility room and toilets. It will be fully accessible. The internal walls will be insulated to reduce energy use with the potential to add solar panel if funding is available in the future.

What we'll deliver:

  • Fully accessible workshop space
  • Paint & decorate building
  • New doors and windows
  • Restore walls & ceiling

Why it's a great idea:

This exciting project will bring back into use a community building by local residents. There is a shortage of activity space where 'messy' activities can be undertaken in the village. Things like cycle repair workshops, allotment holders tool storage and bird box making workshops for example. HPC decided it wanted the building to be fully accessible and refurbished to the highest eco standards so the costs involved are beyond that available within existing Council budgets. The refurbished building will be a hub for community activity as we come out of the pandemic (hopefully!) and will encourage greater participation by residents in community activities.

Steps to get it done:

  • Building gutted
  • New walls installed
  • New ceilings in place
  • New external security doors fitted
  • New internal fixatures and fitting completed

Location Hartford

About the space

Custom Location

Council

Cheshire West and Chester

How will the money be spent?Total £72,964

Builders quotation for total refurbishment - £60,000 (82%)
Painting & decorating - £10,000 (14%)
Other - £2,964 (4%)

Costs Breakdown

This shows how money raised for the project will be spent. These costs have been confirmed by the project's Delivery Manager and verified.

82%
Builders quotation for total refurbishment
£60,000
14%
Painting & decorating
£10,000
4%
Other Read More
£2,964
  • Spacehive fees
    £2,415
  • VAT
    £483
  • Transaction fees
    £66

Overfunding

This project is enabled for overfunding. If the project hits its funding goal before the end of the campaign period, any extra funds raised will be spent (in order of priority) on:

  • Install solar panels
  • Enhance the exterior area with the installation of a large covered decking area

Total £72,964

Our Volunteer List

We're currently looking for people to offer skills and time to develop our project! Check out the list of what we need below and then use the 'Volunteer' button to the right to get involved.

Want to help?

Do you have stuff or skills to contribute to this project? Use this tool to offer something to the project creator.

Volunteer
{{comment.UserName}} Creator Backer
{{comment.Comment}}
{{comment.Comment}}
{{reply.UserName}} Creator Backer
{{reply.Comment}}
{{reply.Comment}}