For the past few weeks on the first floor there has been plastering,windows fitted and lighting installed. The staircase has been installed aswell. The ground floor of the building has windows also installled on the outside of the building and inside of building including the reception area,hall area and main waiting area. Plastering has also been done. Soon the building will be painted inside of the ground floor and first floor. The reception area has been built too as shown in he image above. This will be where there is easy access for the disabled and elderly. The front doors of the reception area has also been fitted.