Restore & Row: Grosvenor's Legacy

Repairing and insulating Grosvenor Rowing Club’s roof to enhance efficiency, reduce carbon emissions, and safeguard a key community sports hub.

This project has reached its fundraising target. It has also activated Continuous Fundraising, which means you can still donate and support the project.

Loading...

Our Delivery Report

Funded on 24 July 2025 | Delivered on 15 August 2025

£6,178

RAISED

54

BACKERS

64

DAYS TO FUND

BIGGEST PLEDGE

Largest pledge from Cheshire West and Chester Council

£3,400

From Cheshire West and Chester Council

Cheshire West and Chester Council

Cheshire West and Chester Council donated £1,000

Project Image
Project Image
Project Image
Project Image

Grosvenor Rowing Club

The Latest from Restore & Row: Grosvenor's Legacy

  • Arranged for professional scaffolding to be erected (3x towers).
  •  Replaced missing section of guttering on left hand side of building.
  • Stripped off the right-hand verge at the front of property approximately 1/3rd of the way up from bottom to replace missing under cloaking, then re-bedded gable tiles with a sand and cement mix
  • Replaced broken, slipped and missing tiles on both elevations of the main roof like for like. 
  • Removed pigeon nest from above the bay window on side of the property and blocked off entry points with lead flashings and pigeon spike strips to prevent further nests forming.
  • Replaced a missing brick from under the eaves on the side of property (under left hand gable) then rendered to match existing finish.
  • Once render had dried painted with exterior paint to match existing finish.
  • Cleared out all guttering and ensured downspouts cleared of blockages.
  • Removed all rubbish and debris from site and dispose of correctly. 
  • Supplied and installed quilt insulation to all attic spaces. Ensured that building regulations of a minimum 270mm thickness met.
  • Rolled out a first layer of 200mm thick quilt insulation. Then top off in opposite direction with another layer of 100mm quilt insulation creating a total thickness of 300mm.
  • Ensured that both layers were left back from the eves to ensure air flow to prevent condensation build up.
  • Removed all rubbish and debris from site and disposed of correctly.