close search

Disabled changing space

Impact data and claims within this report are provided by the project creator and have not been independently verified by Spacehive.

Disabled changing space

Disabled changing space

Sensory World By Sensory World

Develop a disability changing space with an adult changing bed and ceiling Hoist.

Dewsbury Idea stage

This project is preparing for fundraising. Click Like to show your support, or Follow for updates on this project's journey.

Sensory World is looking to further develop a toilet into a changing space with adult changing bed and ceiling hoist. Sensory World was founded in 2014 and has proven to be a success with visitors from different parts of the country. By developing the existing toilet would mean a wall needs to be removed and girders put in for strength, equipment installed I. E radiator, changing bed,hoist and to be fully tiled and decorated. To have this facility would mean we can advertise on the changing space site so we be a fully inclusive centre not only for those who visit us but can be available for anyone visiting Dewsbury.

What we'll deliver:

  • A new Disabled Toilet.
  • A more accessible space.

Why it's a great idea:

The benefits from developing this toilet would mean it would be accessible to those needing hoisting and therefor would be able to visit Sensoryworld and use the activities available.

Steps to get it done:

  • Buying equipment
  • Building work.
  • Tiling and decorating

Gallery

Location Dewsbury

About the space

Custom Location

Council

Kirklees Council

How will the money be spent?Total £17,366

Removal of toilet and walls - £7,800 (45%)
Purchase and installation of Joist - £4,200 (24%)
Building Regulations Costs - £1,762 (10%)
Paints - £1,527 (9%)
Structural Engineers' Site visit and calculations - £540 (3%)
Building Control Fee - £163 (1%)
Other - £1,375 (8%)

Costs Breakdown

This shows how money raised for the project will be spent. Before entering fundraising these costs will be confirmed by the project's Delivery Manager and verified by the verifier.

45%
Removal of toilet and walls
£7,800
24%
Purchase and installation of Joist
£4,200
10%
Building Regulations Costs
£1,762
9%
Paints
£1,527
3%
Structural Engineers' Site visit and calculations
£540
1%
Building Control Fee
£163
8%
Other Read More
£1,375
  • Spacehive fees
    £800
  • Transaction fees
    £415
  • VAT
    £160

Overfunding

This project is enabled for overfunding. If the project hits its funding goal before the end of the campaign period, any extra funds raised will be spent (in order of priority) on:

  • More paint for decorations!

Total £17,366

Our Volunteer List

We're currently looking for people to offer skills and time to develop our project! Check out the list of what we need below and then use the 'Volunteer' button to the right to get involved.

Want to help?

Do you have stuff or skills to contribute to this project? Use this tool to offer something to the project creator.

Volunteer
{{comment.UserName}} Creator Backer
{{comment.Comment}}
{{comment.Comment}}
{{reply.UserName}} Creator Backer
{{reply.Comment}}
{{reply.Comment}}